Singapore BIM Guide Version 2.0 >

Singapore BIM Guide Version 2.0

The Singapore BIM Guideis a reference guide that outlines the roles and responsibilities of project members when using Building Information Modelling (BIM) at different stages of a project.It is used as a reference guide for the development of a BIM Execution Plan, which will be agreed between the Employer and project members, for the successful implementation of a BIM project.

The Singapore BIM Guide consists of both BIM Specifications and BIM Modelling and Collaboration Procedures.

The Singapore BIM Guide Version 1.0 was launched in May 2012. It was updated and revised into the Singapore BIM Guide Version 2.0, and released on August 2013.

The BIM Particular Conditions may be attached to contracts in projects where BIM is used. The BIM Particular Conditions Version 1.0 was originally published as Appendix E in the Singapore BIM Guide Version 1.0. An independent copy of the BIM Particular Conditions Version 1.0 can be downloaded on this website.

It was updated and revised into the BIM Particular Conditions Version 2.0, released on August 2015. A set of Guidance Notes have also been released on August 2015 to highlight changes between Versions 1.0 and 2.0 of the BIM Particular Conditions.

Integrated Digital Delivery (IDD)

IDD refers to the use of digital technologies integrate all processes and stakeholders throughout the construction life-cycle. It covers 4 areas - design, manufacturing and fabrication, construction and asset delivery & management.

For more information on IDD, please click here.

We welcome readers to share your comments, proposed changes and additions to the Singapore BIM Guide and the BIM Particular Conditions. Feedback will be gathered and continuously reviewed; they will be collated to form new revisions at appropriate intervals.

For suggestions, feedback and enquiries, please email to huang_yixiang@bca.gov.sg.